3 febbraio 2010

Area 2, remotion of the collapse US 4, extended all over the area.

The working day has been dedicated to the remotion of the collapse made up of big and medium-size stones (US 4) extended all over Area 2 and to the reprise of the excavation  of the ambients individualized during the previous digging campaign (Area 1). Thanks to the help of the mechannical excavator it has been possible to remove a first bunch of the collapse US 4, which has a thickness of about one meter. Under the collapse we pointed out a wall extended from East to West, linked to a phase previous to the castle. The interpretation of the structure will be anyway possible only in the following days. 

As regards the investigation of Area 1, the day has been dedicated to the cleaning of ambients 1 and 3 and to the removal of the layers individuated last year.

Area 2, remotion of the collapse US 4 with the mechanical excavator
Remotion of the collapse US 4, extended all over the area.
Relation between the boundary wall and the structure under the collapse.
Area 2 during its excavation.
General cleaning of sector 3.
General cleaning of sector 1.
General cleaning of sector 1.
Area 2, particular of the collapse US 4, extended all over the area.
Area 2, particular of the collapse US 4, extended all over the area.
Area 2, remotion of the collapse US 4, extended all over the area.
The collapse US 4, partly excavated.
Area 2, remotion of the collapse US 4, extended all over the area.