3 Dicembre 2010

The day has been completely spent on cleaning Room 12, located in the west side of the hilltop. Besides this zone, where we spotted out the entrance to Room 5, during the next days we will be concentrating inside Room 5 and in the closer places, where we hope to find out the disposition of other portions of the defensive walls, even if they will probably be in a bad state of preservation.
In Room 1 the survey had been concentrated in the space external to the structure, by cleaning up the walls.

The passage between room 12 and the townwall
The passage between room 12 and the defensive wall
The passage between room 12 and the defensive wall
The section of the defensive wall digged today
The section of the defensive wall digged today
The section of the defensive wall digged today
The section of the defensive wall digged today
The front wall in room 5
The walls of room 1
The walls of room 1
The walls of room 1
Ripulitura dei muri perimetrali di ambiente 1