15 aprile 2010

Room 6 at the end of the digging day

Room 1 in the Area 1 is almost complete the removal of the fireplace, beneath which the rock continues to appear strongly reddened because the prolonged exposure to heat.

In room 3 in the Area 1 has been removed layer US 79, beneath which was found a level of collapse composed of medium to large stones that stretches across the northern environment.

It has been expanded the survey, begun yesterday, in room 6, located in the eastern portion of Area 1, was identified east of the continuation of the wall (phase II) which forms the boundary between Area 1 and Area 2.

In Area 2, the investigation focused in the northwest, which has been expanded westward with the aid of mechanical excavator and involved removing part of the collapse of building structures.

Wall US 11 in Area 2
Il crollo individuato nell'ambiente 3
Wall US 11 in Area 2
Room 6 at the end of the digging day
Wall US 4 in Area 1
Digging in Area 2
Digging in Area 1
Digging the fireplace  US 75