Warning: Table './trinoro/dp_watchdog' is marked as crashed and should be repaired query: INSERT INTO dp_watchdog (uid, type, message, variables, severity, link, location, referer, hostname, timestamp) VALUES (0, 'php', '%message in %file on line %line.', 'a:4:{s:6:\"%error\";s:12:\"user warning\";s:8:\"%message\";s:614:\"Table './trinoro/dp_watchdog' is marked as crashed and should be repaired\nquery: INSERT INTO dp_watchdog\n (uid, type, message, variables, severity, link, location, referer, hostname, timestamp)\n VALUES\n (0, 'filefield', 'FileField was trying to display the file %file, but it does not exist.', 'a:1:{s:5:\\"%file\\";s:79:\\"sites/archeologiamedievale.unisi.it.trinoro/files/immagini/context/06:04_02.jpg\\";}', 4, '', 'http://archeologiamedievale.unisi.it/trinoro/en/node/78& in /var/www/html/archmed.archeo.unisi.it/drupal6/includes/database.mysqli.inc on line 134
6 aprile 2009 | Castiglioncello del Trinoro

6 aprile 2009

user warning: Table './trinoro/dp_watchdog' is marked as crashed and should be repaired query: INSERT INTO dp_watchdog (uid, type, message, variables, severity, link, location, referer, hostname, timestamp) VALUES (0, 'filefield', 'FileField was trying to display the file %file, but it does not exist.', 'a:1:{s:5:\"%file\";s:79:\"sites/archeologiamedievale.unisi.it.trinoro/files/immagini/context/06:04_02.jpg\";}', 4, '', 'http://archeologiamedievale.unisi.it/trinoro/en/node/78', '', '23.22.252.150', 1369289120) in /var/www/html/archmed.archeo.unisi.it/drupal6/modules/dblog/dblog.module on line 146.
The remove of the collapse US 39

We started today the fifth week of archaeological investigation at Castiglioncello del Trinoto. 

Our activities include the central part of Area 1, the walls between US 14 (north-west of the tower), US 5 (north-east side of the tank) and US 34. It has been shown to only partially, a small section of masonry (US 42) which leans against the wall US 34. It consists of small to medium sized stones without binder. It is very likely to place a partition wall between two rooms yet to define. 

In anticipation of the use of a mechanical means to make a change in the coming days for further testing in this part of the summit of the hill, we have ceased operations in these areas for focus within the tower. We have begun to remove the layer composed of US 39 earth and stones of various sizes belonging to the destruction of the tower.

The remove of the collapse US 39
The remove of the collapse US 39
The wall US 42